IT Park

Ascendas – MTB3, Bangaluru

It has 2 Basement + Ground + 13 Storey

Developer: ASCENDAS Information Technology Park Ltd.

Architect: Edifice Consultants

Structural System: Post tensioned flat slab system

Total built-up area: 909890 sqft

Year of Completion: 2015

Globe IT Park, Bangaluru, India (Phase I)

It has 3 basements + ground floor +11 floors

Developer: Adamas Buillders Private Ltd.,

Architect: CPG Consultants (I) Private Ltd.,

Structural System: Post-tensioned beam with RC slab

Total built-up area: 12.5 Lacs sqft

Year of Completion: 2015

Globe IT Park - Phase 2 at Bangalore, India

Globe IT Park, Bangaluru, India (Phase II)

It has 1 basements + ground floor +11 floors

Developer: Adamas Buillders Private Ltd.

Architect: CPG Consultants (I) Private Ltd.

Structural System: Post-tensioned beam with RC slab

Total built-up area: 12.5 Lacs sqft

Year of Completion: Ongoing

RMZ Ecoworld, Bangaluru, India

It has 3 basements + ground + 11 floors

Developer: RMZ Eco World Infrastructure Ltd.

Architect: DP Architects Pte Ltd.

Structural System: Post-tensioned flat slab

Total built-up area: 21 Lacs sq. ft.

Year of Completion: Ongoing

Ascendas IT Park Phase - I

11-storey office Building situated at Chennai, India.

Architect: Architects Team 3

Project Cost: INR 1500 Million

Year of Completion: 2005

Ascendas IT Park Phase - II

14 storey tower building with one Basement.

Client: L&W Construction Pvt Ltd

Year of Completion: 2007

Ascendas IT Park Phase - III

14-storey office Building and 10 storey annex building for car park situated at Chennai, India.

Architect: CRN Architects, Chennai

Year of Completion: 2010

Chennai Tech Park at Ambattur, (Phase I)

Building has 3 levels of Basements and 15 storey of Tower Blocks

Client: India Infotec Developers Ltd Chennai

Structural System: Post-tensioned Slab

Total BUA: 2.6 million sq. ft.

Year of Completion: 2010

Chennai Tech Park at Ambattur, (Phase II)

Building has 3 levels of Basements and 15 storey of Tower Blocks

Client: India Infotec Developers Ltd Chennai

Structural System: Post-tensioned Slab

Total BUA: 2.6 million sq. ft.

Year of Completion: 2010

Olympia Cyber Space IT Park at Guindy

It is a 1B+4 Level Stilt +10 Storey Building design as PT Flat Slab system

Developers: OLYMPIA CYBER SPACE PVT LTD

Architect: RSP Designs Consultants (India) Pvt Ltd

Total BUA: 12 Lakhs Sq.ft.

Year of Completion: Ongoing

RMZ One Paramount Phase-I

2 Blocks of 11 storey (GF+10F) IT Park Tower with 3 basement

Client: RMZ Infinity (Chennai) Ltd.,

Structural System:Lateral load resisting system Is Flat Slab with structural wall system. The floor system is post tensioning flat slab system.

Total BUA: 2.25 Million Sqft.

Year of Completion: 2023

RMZ One Paramount Phase-II

3 Basements + Ground + 10 Floors

Developers: RMZ Infinity (Chennai) Ltd.

Foundation System: Bored piles as Foundation system

Structural system: Structural RCC wall with PT flat slab

Total BUA: 3.86 Million Sft

Year of Completion: Ongoing

TCS New Tech Park at Sipcot Siruseri

It is a 1B+3 Level Stilt +1 Podium+10 Storey Building design as PT Flat Slab system

Developer: TATA CONSULTANCY SERVICES LTD

Architect: RSP Designs Consultants (India) Pvt Ltd.

Total BUA: 32 Lakhs Sq.ft.

Year of Completion: Ongoing

Ascendas – MTB6

It has Main building consist of 2 Basement + Ground + 14 Storey and MLCP Building 3Basement + Ground + 4 Storey

Developer: VITP Private Ltd.

Architect: Edifice Consultants

Structural System: Post tensioned flat slab system

Total built-up area: 801007 sqft.

Year of Completion: 2018

RMZ Nexity

3 Blocks of 22 storey (GF+21F) IT Park Tower with 5 basement, 1 Block of 6 storey (GF+5F) with 3 basement

Client: RMZ Corp., Bangalore

Structural System: Structural RCC wall with PT flat slab system

Total built-up area: 4.76 Million Sqft

Design & Build Contractor: L&W Constructions Pvt Ltd.

Year of Completion: 2024

IGATE Global Solutions

It has 4 level of Stilt floor + 12 Storey

Developer: IGATE GLOBAL SOLUTIONS LIMITED

Architect: DSP Design Associates Pvt Ltd

Structural System: Post tensioned flat slab system, the lateral load resisting system of the buildings is Ductile shear wall with Special Moment Resisting Frames

Total built-up area: 21,71,611sqft

Year of Completion: 2018

Ascendas IT Park Phase - I

Development Comprising 5 Blocks of Its Facilities, Retail Shops, Recreational Facilities and Amenities, at Hinjewadi, Pune, India

Architect: Rajinder Kumar Associates

Year of Completion: 2012

CapGemini Phase 2A & 2B

2 Basements + Ground + 8 Floors

Developer: Capgemini Technology Services India Limited

Design & Build Contractor: L&W Constructions Pvt Ltd

Foundation System: Raft foundation for core area and Isolated foundation for columns

Structural System: Structural RCC wall with PT flat slab system

Total built-up area: 1.32 Million Sft

Year of Completion: Ongoing